Electrical

Critical Electrical Installation for Holland & Barrett HQ, Burton

New Plant Room Electrical Installation with Generator and Automatic Transfer Switch

Client: Holland & Barrett
Location: Burton
Project: New Plant Room Electrical Installation with Generator and Automatic Transfer Switch
Scope of Work: Electrical Installation for Central Data Hub, Generator Supply, Automatic Transfer Switch Installation
Outcome: A Seamless, State-of-the-Art Backup Power Solution for Holland & Barrett’s UK Branch Network

The Challenge

Holland & Barrett’s headquarters in Burton houses the central hub for their data network, managing the operations of all their branches across the UK. A power outage at this facility would disrupt the entire network, causing widespread downtime across the company’s retail locations.

To ensure uninterrupted power supply, Holland & Barrett required a highly reliable backup system. Premier Security & Electrical Solutions Ltd was commissioned to install a state-of-the-art generator supply and automatic transfer switch (ATS) in the plant room to guarantee continuous power to this mission-critical data hub.

The Solution

Premier Security & Electrical Solutions Ltd took on the responsibility of designing and installing an advanced electrical system that would ensure Holland & Barrett’s operations never experience downtime due to power outages. The solution involved:

  1. New Plant Room Electrical Installation: We performed a complete electrical installation in the plant room, which included:
    • Installing robust and energy-efficient electrical infrastructure to support the operations of the data hub.
    • Ensuring compliance with strict safety and reliability standards required for critical data systems.
  2. Generator Supply and Automatic Transfer Switch (ATS): To ensure seamless power continuity, we supplied and installed a high-performance generator system equipped with an automatic transfer switch. Key features included:
    • Automatic Power Transfer: In the event of a power failure, the ATS automatically switches to the backup generator, ensuring that the data hub remains fully operational without any downtime.
    • Self-Monitoring Fuel System: The generator was configured to automatically monitor fuel levels. When running low, the system triggers an automatic call to a refill truck, ensuring the generator is always fueled and ready.
    • State-of-the-Art Technology: The entire setup was built to meet the highest standards of reliability and efficiency, making it one of the most advanced systems in use for critical infrastructure like this.

The Outcome

Premier Security & Electrical Solutions Ltd delivered a comprehensive and highly advanced power backup solution, providing Holland & Barrett with peace of mind. The seamless integration of the generator supply and automatic transfer switch ensures that if power is lost, the backup system kicks in without delay, maintaining full operations at the central data hub.

By leveraging cutting-edge technology, the generator system automatically manages fuel levels, making the solution not only reliable but also low-maintenance. Holland & Barrett now benefits from a robust and fully automated backup power system, safeguarding the continuity of their entire UK branch network.

This project was completed on time and within budget, and Holland & Barrett’s data centre is now fully protected against any potential power disruptions.